MINING SCOPE OF SUPPLY
Dragline shut downs. Approx. 8 years.
Dragline services. Approx. 10 years.
Manufacture and installation of all types of steel and stainless-steel work including:
- Structures.
- Walkways.
- Platforms.
- Supports and bases for pump and pipe installations.
Replacement of EH 3500 bumpers.
Maintenance of EH 3500 bowls.
Installation and maintenance of wash-bay pumps and piping.
Maintenance on all HME equipment, including all pumps.
Fire hydrant lines: New installations and maintenance.
Specialised welding on liners and lifting equipment at plant and mining side.
Maintenance on all Drill-tech equipment, shovels and PC machines.
Refurbishment of all HME buckets.
Refurbishment of dozer blades, including manufacture and supply of pins, keeper plates, special bolts and nuts required for these.
Repair of conveyor belt structures, chutes and hoppers, manufacture of new items when required.
Assist with Drew Boy installations and do repairs.
Manufacture and supply new cable tower skids, complete.
Manufacture and supply new Janus box skids, and new Janus Boxes.
Manufacture drip trays and do maintenance on oil skids.
Maintenance at reticulation Fuel Farm.
References will be supplied upon request.
POWER GENERATION
Installation of a Dryer for the Force cooling Compressor.
Resin replacement project at the Water Treatment Plant.
Install Submersible pumps and piping.
Fugitive Dust Plant Upgrade.
Install a Closed Cooling System for the Force cooling Compressor.
References will be supplied upon request.
STEEL MILLS
arious new pump installations and modifications to pipe work to suit new pumps.
Manufacture and installation of new pipelines and modifications to existing lines.
Steel manufacturing as per supplied drawings, and installation of manufactured items when required.
Maintenance and repairs to, and shut downs on, blast furnaces C, D and N.
References will be supplied upon request.
MUNICIPAL – WATER AND WASTE WATER APPLICATIONS
Maintenance at water and waste water treatment plants and pump stations.
Manufacture and installation of new pipelines and modifications to existing lines, as required
Manufacture and installation of waste water treatment equipment such as Screw conveyors, Camelback presses, Screens and Sluice Gate Valves in Stainless steel.
New pump installations and modifications to pipe work to suit new pumps.
Civil work.
References will be supplied upon request.
MINERAL PROCESSING INDUSTRY – CEMENT
Liner replacement on ball mills.
Crack repairs on ball mills and other equipment.
Manufacture and installation of equipment such as screw conveyors, air slides, bucket elevators, fans etc. as well as repairs to the equipment.
Design, installation and load testing of lifting beams.
Chain and bucket replacement on bucket elevators.
Steel repairs at the tip.
Civil work.
References will be supplied upon request